أكثر من 150 من الغلايات بقدرات مختلفة. (MOH)
أكثر من 50 غرفة من المراجل مع معدات كاملة. (MOH)
مشاريع أرامكو السعودية :
اسم المشروع |
الوصف |
Water Injection Plant Bqaiq |
Boiler System – S Stamp
Diff Capacity : 1500 KG/HR
|
Refinery Rahima |
3nos. Air Separator |
Project 2124 Qatif |
Steam Condensate LP Flash Tank |
Petrokemya |
Vacuum System Drum |
Berri Gas Plant |
Suction Drums |
Berri Gas Plant |
Air Surge Drum |
SCECO :
اسم المشروع |
الوصف |
PP 9 & PP9 Stage II Phase C&D |
57 Vessel & Tank
HRSG Tanks, Blowdown Tanks, Drain Tanks, Flash Tank, Single Skin S.S Tanks & LPG Tank.
Diff Capacity : 10 ,20,30,35 CUM
|
PP 7 & PP 8 Fuel Gas Project |
12 Vessel & Tank
Diff Capacity : 1.5 ,30,60 CUM
|
PP 10 Mobile Skid Boiler |
2 nos.
Capacity : 4000 Kg /Hr Steam – 300 Litter Water
|
SWCC :
اسم المشروع |
الوصف |
Shuaiba Project |
50 Surge Vessels , Thik 50 – 70 mm
Diff Capacity : 70,000-150,000-160,000-156,000 L
|
Taif Al Baha Project |
3 Surge Vessels
Capacity : 60,000 L and Thik : 100 mm
|
وزارة الصحة :
اسم المشروع |
الوصف |
South Riyadh Hospital (200 Bed) |
3nos. 2,500 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
Turaif General Hospital “ Khatib & Alami” |
3nos. 2,000 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
Tabrjal General Hospital “ Khatib & Alami” |
3nos. 2,000 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
Al Wajih General Hospital “ Khatib & Alami” |
3nos. 2,000 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
Al Quraiyat General Hospital “ Khatib & Alami” |
3nos. 2,000 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
Tabuk General Hospital (500 Bed) |
3nos. 2,000 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
Al Kharj General Hospital (200 Bed) |
3nos. 2,000 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
Khamis Mushait Hospital (200 Bed) |
3nos. 2,000 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
Tabuk Hospital (200 Bed) |
3nos. 2,000 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
Al Kharj Hospital (200 Bed) |
3nos. 2,000 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
Hail General Hospital (100 Bed) |
3nos. 2,000 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
Bisha General Hospital (100 Bed) |
3nos. 2,000 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
King Khalid Hospital - Tabuk |
2nos. 4,600 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
General Hospital - Jeddah |
2nos. 4,000 Kg/Hr Steam Boilers
with Complete Boiler Room Equipment
|
المياه الوطنية :
اسم المشروع |
الوصف |
Water Transmition Line To Najran |
Surge Vessels
Diff Capacity : 33,000 -66,000 – 90,000 L
|
P334 Turif Project |
Surge Vessels
Diff Capacity : 25,000 -37,000 – 61,000 – 74,000 L
|
Fifa Project |
Surge Vessels
Diff Capacity : 8,000 -9,000 – 20,000 L
|
Baha Project |
Surge Vessels
Diff Capacity : 15,000,17,000-18,000-20,000 L
|
Al Hunnay Project |
28 Surge Vessels
Diff Capacity : 42,000-82,000-105,000-110,000 L
|
|
|
|
|